Project Information

Client: RG Property

Architect: Mode Design Corp

Steel Products: 

Builder: Badge Constructions

Steel Fabricator: Steelscene

Previous slide
Next slide

Project Details

Engaged by RG Property in the early stages of the project (ECI phase), Badge Constructions was initially appointed to make recommendations on the selection of building materials and methods that would reduce cost and speed up the construction program. The collaborative ECI phase ran for four weeks and concluded with Badge Constructions proposing the use of LGS framing.

With these recommendations submitted to RG Property, Badge Constructions was awarded the Design and Construct (D&C) contract and they subsequently engaged architectural firm, MODE Design Corp, to complete construction design detailing for the project. Having worked together on the WA PPP Schools project, Badge Constructions engaged Fabricator, Steelscene, during this 10-week design period to first design and then fabricate the LGS framing made from TRUECORE® steel.